Skip Maine state header navigation

Agencies | Online Services | Help

NOTE:
There are known issues with some versions of Adobe PDF Reader. It is recommended to start Adobe PDF Reader before attempting to review the PDF documents below (or Adobe reader may "hang").

 
Section
Documents

Revision 1.1 (02-01-06)

LURC Forms

DEP Forms

LURC Chapter 10.21, G

8,a 8,a(2) 8,a(3) 8,a(8) 8,a(9) 10,a(2)(a) 10,a(2)(b)

Redington Mountain Windfarm project description including engineering detail for Roads, Power Lines, and Turbine Foundations.

3.0 Financial Capacity

3.1 Edison Letter

6.0 Visual & Scenic Report

8.0 Historical Research Narrative

8.1 Historical Preservation Commission Correspondence

8.2 Native American Tribes Correspondence

9.0 Natural Areas Overview

10.0 Buffers Overview

12.0 Stormwaters Overview

14.1 Roadway Erosion & Sedimentation Control

14.2 Powerline Erosion & Sedimentation Control

14.3 Attachment D - Figure T-1

15.0 Groundwater Narrative
16.0 Water Supply Narrative

17.0 Wastewater Narrative

17.1 Subsurface Wastewater Disposal System Application

18.0 Solid Waste Narrative

18.1 Stump Dump Locations Map

19.0 Flooding Narrative
20.0 Blasting Narrative
21.0 Air Emissions Narrative
22.0 Odors Narrative
23.0 Water Vapor Narrative
24.0 Sunlight & Shadow Narrative