Section |
Documents |
Revisions
&
Clarifications |
(07-09-07)
Revised Application for Black Nubble Wind
Farm
Cover
Letter (UPDATED)
02-01-06
Revision 1.1 - Preliminary Submission Corrections
02-01-06 Revision 1.1 Cover
Letter
02-01-06 Revision
1.1 Detail Sheet
02-01-06 Revision 1.1 Clarification
Sheet (Q and A)
Police
Coverage Letter
Maine
Forest Service / Fire Coverage Letter
|
Forms
LURC & DEP Forms |
LURC Forms
Application
for Non-Residential Development
Supplement
S-2
Supplement
S-3 (UPDATED)
RMW
LLC Certificate of Good Standing (N/C)
MMP
LLC Certificate of Good Standing (N/C)
DEP Permit
DEP Permit (NEW)
Notice
of Intent to Comply (N/C)
US Army Corps of Engineers
US Army Corps of Engineers Permit (NEW) |
Section 1
Development Description
LURC Chapter 10.21, G
8,a 8,a(2) 8,a(3) 8,a(8)
8,a(9) 10,a(2)(a) 10,a(2)(b)
Black Nubble Mountain Wind Farm project
description including engineering detail for Roads, Power Lines,
and Turbine Foundations.
|
Development
Description & Overview (UPDATED)
Section 1 Appendices
1.0 – Project
Base MAP (C3) (UPDATED)
1.1 – LURC Land Use Guidance Maps
1.2
(P-SG) Soil and Geology Protection Subdistrict Detail Map (UPDATED)
1.3 Project Location / LURC Jurisdiction Fringe Maps (New)
2.0 – Road
Design Narrative (UPDATED)
2.1
Mountain Road Maps (C1-C2 & C-BN4-7 & C-BN18) (UPDATED)
2.10
Additional Civil Design Criteria (New)
2.11 Civil Engineering Design Specifications (New)
2.2
Road Detail (C46-C55) (UPDATED)
2.3
Mountain Drainage Analysis Maps (C-BN56-58) (UPDATED)
2.4
Cut / Fill Road Analysis Detail (C-BN24-30) (UPDATED)
2.5
Slope Maps (S1-S2) (UPDATED)
2.6
RMW Narrow Road Specification (UPDATED)
2.7
Deluca-Hoffman Site Visit Notes (N/C)
2.8 Wetland Detail Maps (C40-C43) (NEW)
2.9 Substation Detail (C-44) (NEW)
3.0 – Obsolete - See: 2.8 Wetland Detail Maps (C40-C43)
4.0 – Bridge
Design Narrative (MINOR UPDATES)
4.1
Bridge Design Drawings (N/C)
5.0 – Electrical System
5.1
Collector System & Substation Design (UPDATED)
5.2 Collector System Design Appendices
5.3
Transmission Line Construction Plan (MINOR UPDATES)
5.4
System Impact Study Summary (UPDATED)
5.5 E-Series 34.5 kV Line Maps
Obsolete - see Wildlife and Fisheries Figure 7.1
6.0
V90 General Specifications (N/C)
7.0 Wind Turbine Foundation Details
7.1 Patrick & Henderson Drawings
8.0 Turbine Transportation & Assembly
Details
8.1
Transportation Images - Buffalo Mt. Tennessee (N/C)
8.2
Turbine Installation Video (Vestas Promotional) (N/C)
8.3
Vestas V90 Road & Transport Specifications (UPDATED)
9.0 FAA Lighting Details
9.1
Turbine Latitude / Longitude Coordinates (UPDATED)
9.2
FAA Lighting Map (UPDATED)
9.3
Light Beacon Light Distribution Diagram (N/C)
10.0 Demonstrated Need
10.1
Electricity Shopping becoming Essential (N/C)
10.2
Windfarm Economic Impact Study (N/C)
10.3
Natural Gas and Wind Implications (N/C)
10.4
Fuel Diversity Need - ISO NE Report (N/C)
10.5
DOE Maine Wind Energy Map (N/C)
10.6
NRCM Data on Maine Dams (N/C)
10.7
Pollution Avoided Spreadsheet (UPDATED)
10.8
PUC Executive Summary on MWEA (N/C)
11.0 Public Support
11.1
Supporters Database List (N/C)
11.2
Hiker Support Letters (from ATC newsletters) (N/C)
12.0 – Road Reference Photo Collection
12.1
Existing Bridge Images 1 (N/C)
12.2
Existing Bridge Images 2 (N/C)
12.3
Map / Photo Key - Write-Up for above Images (N/C)
12.4
Existing Bridge, Road, & Terrain Photos (UPDATED)
12.5
Map / Photo Key - Write-Up for above Images (UPDATED) |
Section 2
Land Title & Easements
LURC 8,a(1) 8,a(4) 10,a(2)(e)
|
2.0
Land Title Easement Narrative (UPDATED)
2.1
Land and Title Easement Map (UPDATED)
2.2
Black Nubble Windfarm Ground Lease Agreement (N/C)
2.3 Copies of Titles / Easements
- Black
Nubble Deed & Exhibits (N/C)
- Black Nubble Expansion Deed (N/C)
- Redington
Pond Range Deed & Exhibits (N/C)
- Plum Creek - Option Agreement (N/C)
- Bureau
of Park and Lands ROW Option Agreement (N/C)
- Department
of Transportation Underground Permit (N/C)
- Mountain Access Road Widening Easement (NEW)
- Maintenance Area Expansion (NEW)
- International
Paper "IP Road" Easement (NEW)
- 5.75 Acre Heavy Storage Area Option Agreement (NEW)
- Redington Restriction Agreement (NEW)
|
Section 3
Financial Capacity
LURC 8,a(5)
|
3.0
Financial Capacity (UPDATED)
3.1 Edison Letter (UPDATED)
3.2 Edison Mission Energy 2007 Financial Statements (NEW) |
Section 4
Technical Ability
LURC 8,a(4)
|
4.0
Technical Ability Narrative (MINOR UPDATES)
4.1
EEC Resumes (N/C)
4.2
Sub-Contractor Resumes (N/C) |
Section 5
Sound
LURC 8,a(6) 8,a(7) |
5.0
Sound Level Analysis Narrative (UPDATED)
5.1
Vestas Sound Level Acoustical Map (UPDATED)
5.2
Appalachian Trail Sound Level Acoustical Map (UPDATED)
5.3
AWEA Turbine Noise Fact Sheet (N/C) |
Section 6
Visual Quality
&
Scenic Character
LURC 8,a(6) 8,a(7) |
6.0
Visual & Scenic Report
|
Section 7
Wetlands, Wildlife, Fisheries, & Fragmentation
LURC 8,a(6) 8,a(7)
|
7.0
Wetlands, Wildlife, Fisheries, & Fragmentation Overview
Wildlife and Fisheries Figures
|
Section 8
Historic Sites
LURC 8,a(6) 8,a(7) |
8.0
Historical Research Narrative (MINOR UPDATES)
8.1
Historical Preservation Commission Correspondence (N/C)
8.2
Native American Tribes Correspondence (N/C) |
Section 9
Unusual Natural Areas
LURC 8,a(6) 8,a(7) |
9.0
Natural Areas Overview (UPDATED) |
Section 10
Buffers
LURC 8,a(7) 8,a(11) |
10.0
Buffers Overview (UPDATED) |
Section 11
Soils
LURC 8,a(10) |
11.0
Soils Overview (MINOR UPDATES)
11.1
Soils Map (UPDATED)
11.2
Gravel Pit Locations (UPDATED)
|
Section 12
Stormwater Management
LURC 8,a(11) 10,a(2)(d) |
12.0
Stormwaters Overview (UPDATED)
|
Section 13
Property Maintenance
LURC 8,a(7) 10,a(2)(e) |
13.1
Facility & Property Maintenance Overview (MINOR UPDATES)
13.2
Access Road Maintenance (UPDATED)
Access Road Maintenance Attachments (A & B) (UPDATED)
13.3
Maintenance Building Design (N/C)
13.4
Maintenance Building Property Layout (N/C)
13.5
Maintenance Property Survey (N/C) |
Section 14
Erosion & Sedimentation
LURC 8,a(11) 10,a(2)(d) |
14.1
Roadway Erosion & Sedimentation Control (UPDATED)
Roadway Erosion & Sedimentation Control Attachments (A & B) (UPDATED)
14.2
Powerline Erosion & Sedimentation Control (UPDATED)
Transmission Erosion & Sedimentation Control Attachments (A & B) (UPDATED)
14.3
Attachment D - Figure T-1 (UPDATED) |
Section 15
Groundwater
LURC 8,a(6) 8,a(7)
|
15.0
Groundwater Narrative (MINOR UPDATES) |
Section 16
Water Supply
LURC 8,a(12) |
16.0
Water Supply Narrative (UPDATED) |
Section 17
Wastewater Disposal
LURC 8,a 10,a(2)(c) |
17.0
Wastewater Narrative (MINOR UPDATES)
17.1
Subsurface Wastewater Disposal System Application (N/C) |
Section 18
Solid Waste
LURC 8,a(12)
|
18.0
Solid Waste Narrative (UPDATED)
18.1
Stump Dump Location Map (UPDATED) |
Section 19
Flooding
LURC 8,a(6) 8,a(7) |
19.0
Flooding Narrative (MINOR UPDATES) |
Section 20
Blasting
LURC 8,a(6) 8,a(7)
|
20.0
Blasting Narrative (MINOR UPDATES) |
Section 21
Air Emissions
LURC 8,a(6) 8,a(7)
|
21.0
Air Emissions Narrative (UPDATED) |
Section 22
Odors
LURC 8,a(6) 8,a(7)
|
22.0
Odors Narrative (MINOR UPDATES) |
Section 23
Water Vapor
LURC 8,a(6) 8,a(7)
|
23.0
Water Vapor Narrative (MINOR UPDATES) |
Section 24
Sunlight
LURC 8,a(6) 8,a(7)
|
24.0
Sunlight & Shadow Narrative (MINOR UPDATES) |
|
Intent
to File Recipient List (N/C)
Pre-Submission
Meeting Agenda (N/C)
Meeting
minutes from Pre-Submission meeting (N/C)
Newspaper
notices for DEP Public Information Meeting (N/C)
Meeting
notices for DEP Public Information Meeting (N/C)
Sign-in
sheet from DEP Public Information Meeting (N/C)
LURC
Invitation Letter for Stakeholder Meeting (N/C) |