| Section | Documents | 
        
          | Revisions&
 Clarifications
 | (07-09-07)Revised Application for Black Nubble Wind
              Farm
 
              Cover
              Letter (UPDATED) 02-01-06Revision 1.1 - Preliminary Submission Corrections
 
              02-01-06 Revision 1.1  Cover
                    Letter02-01-06 Revision
                            1.1 Detail Sheet
 02-01-06 Revision 1.1 Clarification
                          Sheet (Q and A)
 
                   Police
                      Coverage LetterMaine
                    Forest Service / Fire Coverage Letter
 | 
        
          | FormsLURC & DEP Forms
 | LURC Forms  Application
              for Non-Residential Development Supplement
              S-2
 Supplement
              S-3 (UPDATED)
 RMW
              LLC Certificate of Good Standing (N/C)
 MMP
              LLC Certificate of Good Standing (N/C)
 DEP Permit DEP Permit (NEW)  Notice
              of Intent to Comply (N/C) US Army Corps of Engineers US Army Corps of Engineers Permit (NEW) | 
        
          | 
              Section 1Development Description
 LURC Chapter 10.21, G  8,a 8,a(2) 8,a(3) 8,a(8)
                8,a(9) 10,a(2)(a) 10,a(2)(b) Black Nubble Mountain Wind Farm project
                description including engineering detail for Roads, Power Lines,
                and Turbine Foundations.  |   Development
                  Description & Overview (UPDATED)   Section 1 Appendices  
 1.0 – Project
              Base MAP (C3) (UPDATED) 1.1 – LURC Land Use Guidance Maps 1.2
              (P-SG) Soil and Geology Protection Subdistrict Detail Map (UPDATED) 1.3 Project Location / LURC Jurisdiction Fringe Maps  (New) 2.0 – Road
              Design Narrative (UPDATED) 2.1
              Mountain Road Maps (C1-C2 & C-BN4-7 & C-BN18) (UPDATED) 
              2.10
                Additional Civil Design Criteria (New) 2.11 Civil Engineering Design Specifications (New) 2.2
              Road Detail (C46-C55) (UPDATED) 2.3
              Mountain Drainage Analysis Maps (C-BN56-58)  (UPDATED) 2.4
              Cut / Fill Road Analysis Detail (C-BN24-30) (UPDATED) 2.5
              Slope Maps (S1-S2) (UPDATED) 2.6
              RMW Narrow Road Specification (UPDATED) 2.7
              Deluca-Hoffman Site Visit Notes (N/C)  2.8 Wetland Detail Maps (C40-C43) (NEW) 2.9 Substation Detail (C-44) (NEW) 3.0 – Obsolete - See: 2.8 Wetland Detail Maps (C40-C43) 4.0 – Bridge
              Design Narrative (MINOR UPDATES) 4.1
              Bridge Design Drawings (N/C) 5.0 – Electrical System 5.1
              Collector System & Substation Design (UPDATED)  5.2 Collector System Design Appendices 5.3
              Transmission Line Construction Plan (MINOR UPDATES)   5.4
              System Impact Study Summary (UPDATED) 5.5 E-Series 34.5 kV Line Maps 
              Obsolete - see Wildlife and Fisheries Figure 7.1 6.0
              V90 General Specifications (N/C) 7.0 Wind Turbine Foundation Details  7.1 Patrick & Henderson Drawings 8.0 Turbine Transportation & Assembly
              Details 8.1
              Transportation Images - Buffalo Mt. Tennessee (N/C) 8.2
              Turbine Installation Video (Vestas Promotional) (N/C) 8.3
              Vestas V90 Road & Transport Specifications (UPDATED) 9.0 FAA Lighting Details 9.1
              Turbine Latitude / Longitude Coordinates (UPDATED)  9.2
              FAA Lighting Map (UPDATED) 9.3
              Light Beacon Light Distribution Diagram (N/C) 10.0 Demonstrated Need 10.1
              Electricity Shopping becoming Essential (N/C) 10.2
              Windfarm Economic Impact Study (N/C) 10.3
              Natural Gas and Wind Implications (N/C) 10.4
              Fuel Diversity Need - ISO NE Report (N/C) 10.5
              DOE Maine Wind Energy Map (N/C) 10.6
              NRCM Data on Maine Dams (N/C) 10.7
              Pollution Avoided Spreadsheet (UPDATED) 10.8
              PUC Executive Summary on MWEA (N/C) 11.0 Public Support 11.1
              Supporters Database List (N/C) 11.2
              Hiker Support Letters (from ATC newsletters) (N/C) 12.0 – Road Reference Photo Collection  12.1
              Existing Bridge Images 1 (N/C) 12.2
              Existing Bridge Images 2 (N/C) 12.3
              Map / Photo Key - Write-Up for above Images (N/C) 12.4
              Existing Bridge, Road, & Terrain Photos (UPDATED) 12.5
              Map / Photo Key - Write-Up for above Images (UPDATED) | 
        
          | 
              Section 2Land Title & Easements
 LURC 8,a(1) 8,a(4) 10,a(2)(e)
 | 2.0
              Land Title Easement Narrative (UPDATED) 2.1
              Land and Title Easement Map (UPDATED) 2.2
              Black Nubble Windfarm Ground Lease Agreement (N/C) 2.3 Copies of Titles / Easements  
              Black
                Nubble Deed & Exhibits (N/C)Black Nubble Expansion Deed (N/C)Redington
                Pond Range Deed & Exhibits (N/C)Plum Creek - Option Agreement (N/C)Bureau
                of Park and Lands ROW Option Agreement (N/C)Department
                of Transportation Underground Permit (N/C)Mountain Access Road Widening Easement (NEW) Maintenance Area Expansion (NEW)  International
                Paper "IP Road" Easement (NEW)5.75 Acre Heavy Storage Area Option Agreement  (NEW)Redington Restriction Agreement (NEW) | 
        
          | 
              Section 3Financial Capacity
 LURC 8,a(5)
 | 3.0
              Financial Capacity (UPDATED) 3.1 Edison Letter (UPDATED) 3.2 Edison Mission Energy 2007 Financial Statements (NEW) | 
        
          | 
              Section 4Technical Ability
 LURC 8,a(4)
 | 4.0
              Technical Ability Narrative (MINOR UPDATES) 4.1
              EEC Resumes (N/C) 4.2
              Sub-Contractor Resumes (N/C) | 
        
          | Section 5Sound
 LURC 8,a(6) 8,a(7)
 | 5.0
              Sound Level Analysis Narrative (UPDATED) 5.1
              Vestas Sound Level Acoustical Map (UPDATED) 5.2
              Appalachian Trail Sound Level Acoustical Map (UPDATED) 5.3
              AWEA Turbine Noise Fact Sheet (N/C) | 
        
          | Section 6Visual Quality
 &
 Scenic Character
 LURC 8,a(6) 8,a(7)
 | 6.0
              Visual & Scenic Report  | 
        
          | 
              Section 7Wetlands, Wildlife, Fisheries, & Fragmentation
 LURC 8,a(6) 8,a(7)
 | 7.0
              Wetlands, Wildlife, Fisheries, & Fragmentation Overview   Wildlife and Fisheries Figures  | 
        
          | Section 8Historic Sites
 LURC 8,a(6) 8,a(7)
 | 8.0
              Historical Research Narrative (MINOR UPDATES) 8.1
              Historical Preservation Commission Correspondence (N/C) 8.2
              Native American Tribes Correspondence (N/C) | 
        
          | Section 9Unusual Natural Areas
 LURC 8,a(6) 8,a(7)
 | 9.0
            Natural Areas Overview (UPDATED) | 
        
          | Section 10Buffers
 LURC 8,a(7) 8,a(11)
 | 10.0
              Buffers Overview (UPDATED) | 
        
          | Section 11Soils
 LURC 8,a(10)
 | 11.0
              Soils Overview (MINOR UPDATES) 11.1
              Soils Map (UPDATED) 11.2
              Gravel Pit Locations (UPDATED)
 | 
        
          | Section 12Stormwater Management
 LURC 8,a(11) 10,a(2)(d)
 | 12.0
            Stormwaters Overview (UPDATED) | 
        
          | Section 13Property Maintenance
 LURC 8,a(7) 10,a(2)(e)
 | 13.1
              Facility & Property Maintenance Overview (MINOR UPDATES) 13.2
              Access Road Maintenance (UPDATED) 
              Access Road Maintenance Attachments (A & B) (UPDATED) 13.3
              Maintenance Building Design (N/C)13.4
              Maintenance Building Property Layout (N/C)
 13.5
            Maintenance Property Survey (N/C)
 | 
        
          | Section 14Erosion & Sedimentation
 LURC 8,a(11) 10,a(2)(d)
 | 14.1
              Roadway Erosion & Sedimentation Control (UPDATED) 
              Roadway Erosion & Sedimentation Control Attachments (A & B) (UPDATED) 14.2
              Powerline Erosion & Sedimentation Control (UPDATED) 
              Transmission Erosion & Sedimentation Control Attachments (A & B) (UPDATED) 14.3
              Attachment D - Figure T-1 (UPDATED) | 
        
          | Section 15Groundwater
 LURC 8,a(6) 8,a(7)
 
 | 15.0
            Groundwater Narrative (MINOR UPDATES) | 
        
          | Section 16Water Supply
 LURC 8,a(12)
 | 16.0
            Water Supply Narrative (UPDATED) | 
        
          | Section 17Wastewater Disposal
 LURC 8,a 10,a(2)(c)
 | 17.0
              Wastewater Narrative (MINOR UPDATES) 17.1
              Subsurface Wastewater Disposal System Application (N/C) | 
        
          | 
              Section 18Solid Waste
 LURC 8,a(12)
 | 18.0
              Solid Waste Narrative (UPDATED) 18.1
              Stump Dump Location Map (UPDATED) | 
        
          | Section 19Flooding
 LURC 8,a(6) 8,a(7)
 | 19.0
            Flooding Narrative (MINOR UPDATES) | 
        
          | 
              Section 20Blasting
 LURC 8,a(6) 8,a(7)
 | 20.0
            Blasting Narrative (MINOR UPDATES) | 
        
          | 
              Section 21Air Emissions
 LURC 8,a(6) 8,a(7)
 | 21.0
            Air Emissions Narrative (UPDATED) | 
        
          | 
              Section 22Odors
 LURC 8,a(6) 8,a(7)
 | 22.0
            Odors Narrative (MINOR UPDATES) | 
        
          | 
              Section 23Water Vapor
 LURC 8,a(6) 8,a(7)
 | 23.0
            Water Vapor Narrative (MINOR UPDATES) | 
        
          | 
              Section 24Sunlight
 LURC 8,a(6) 8,a(7)
 | 24.0
            Sunlight & Shadow Narrative (MINOR UPDATES) | 
        
          |  | Intent
            to File Recipient List (N/C)  Pre-Submission
              Meeting Agenda (N/C)  Meeting
              minutes from Pre-Submission meeting (N/C) Newspaper
              notices for DEP Public Information Meeting (N/C) Meeting
              notices for DEP Public Information Meeting (N/C)  Sign-in
              sheet from DEP Public Information Meeting (N/C) LURC
              Invitation Letter for Stakeholder Meeting (N/C) |